2022 Group 400 Acid Plant Turnaround.

Select process equipment had reached its end-of-service life and was programmed for replacement. These include the cold heat exchange, No 1 economizer, and waste heat boiler, and included the interconnecting ducts, dampers, and supporting structures for a complete and total replacement of this equipment

This equipment was removed and replaced in kind with new in the Fall 2022 Turnaround.

SERVICES PROVIDED

  •         Estimating
  •         Scheduling
  •         Procurement of Equipment
  •         Quality Assurance
  •         Design Management
  •         On-Site Construction Management
  •         Start Up and Commissioning